<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/" >

<channel>
	<title>Schools &#8211; Waterproofing Integrity</title>
	<atom:link href="https://waterproofingintegrity.com.au/projects/education/feed/" rel="self" type="application/rss+xml" />
	<link>https://waterproofingintegrity.com.au</link>
	<description>Australia&#039;s leading independent Waterproofing Consultant in new construction and existing assets</description>
	<lastBuildDate>Wed, 27 May 2026 01:40:50 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://waterproofingintegrity.com.au/wp-content/uploads/2026/05/cropped-icon-32x32.png</url>
	<title>Schools &#8211; Waterproofing Integrity</title>
	<link>https://waterproofingintegrity.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>SCEGGS Redlands</title>
		<link>https://waterproofingintegrity.com.au/case-studies/sceggs-redlands/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 09 Apr 2026 03:34:13 +0000</pubDate>
				<guid isPermaLink="false">https://waterproofingintegrity.com.au/?post_type=case-study&#038;p=594</guid>

					<description><![CDATA[The New Learning Hub at the Senior Campus of SCEGGS Redlands had the installation of over 1000 square metres of torch on PVC membrane which lined podium decks and planter boxes. Waterproofing Integrity&#8217;s inspections were utilised to identify where welds may not be completely binding or breaches may have occurred from the movement of other [&#8230;]]]></description>
										<content:encoded><![CDATA[
<section class="wp-block-group wi-paragraph-section has-global-padding is-layout-constrained wp-container-core-group-is-layout-aa998a43 wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">The New Learning Hub at the Senior Campus of SCEGGS Redlands had the installation of over 1000 square metres of torch on PVC membrane which lined podium decks and planter boxes. Waterproofing Integrity&#8217;s inspections were utilised to identify where welds may not be completely binding or breaches may have occurred from the movement of other trades onsite.</p>
</section>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Lindfield Learning Village</title>
		<link>https://waterproofingintegrity.com.au/case-studies/lindfield-learning-village/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 09 Apr 2026 03:29:26 +0000</pubDate>
				<guid isPermaLink="false">https://waterproofingintegrity.com.au/?post_type=case-study&#038;p=592</guid>

					<description><![CDATA[The revitalisation of the Lindfield Learning Village aims to return this site to former glory. Stage 2 involved the installation of a waterproofing system that provided insulation and a method for ongoing testing and inspections.]]></description>
										<content:encoded><![CDATA[
<section class="wp-block-group wi-paragraph-section has-global-padding is-layout-constrained wp-container-core-group-is-layout-aa998a43 wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">The revitalisation of the Lindfield Learning Village aims to return this site to former glory. Stage 2 involved the installation of a waterproofing system that provided insulation and a method for ongoing testing and inspections.</p>
</section>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Inner Sydney High School</title>
		<link>https://waterproofingintegrity.com.au/case-studies/inner-sydney-high-school/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 09 Apr 2026 03:21:37 +0000</pubDate>
				<guid isPermaLink="false">https://waterproofingintegrity.com.au/?post_type=case-study&#038;p=588</guid>

					<description><![CDATA[This high profile redevelopment of this High School on the fringe of the Sydney CBD had Waterproofing Integrity involved to provide waterproofing quality control on waterproofing application on this project. With a number of open areas and a tight schedule, electronic leak detection was used to test areas to confirm compliance prior to further works. [&#8230;]]]></description>
										<content:encoded><![CDATA[
<section class="wp-block-group wi-paragraph-section has-global-padding is-layout-constrained wp-container-core-group-is-layout-aa998a43 wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">This high profile redevelopment of this High School on the fringe of the Sydney CBD had Waterproofing Integrity involved to provide waterproofing quality control on waterproofing application on this project. With a number of open areas and a tight schedule, electronic leak detection was used to test areas to confirm compliance prior to further works.</p>
</section>



<div class="wp-block-group wi-cs-review is-layout-flow wp-block-group-is-layout-flow">


<svg class="wi-cs-review__icon" xmlns="http://www.w3.org/2000/svg" width="24" height="24" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true">
	<path d="M16 3a2 2 0 0 0-2 2v6a2 2 0 0 0 2 2 1 1 0 0 1 1 1v1a2 2 0 0 1-2 2 1 1 0 0 0-1 1v2a1 1 0 0 0 1 1 6 6 0 0 0 6-6V5a2 2 0 0 0-2-2z"/>
	<path d="M5 3a2 2 0 0 0-2 2v6a2 2 0 0 0 2 2 1 1 0 0 1 1 1v1a2 2 0 0 1-2 2 1 1 0 0 0-1 1v2a1 1 0 0 0 1 1 6 6 0 0 0 6-6V5a2 2 0 0 0-2-2z"/>
</svg>



<p class="wi-cs-review__text wp-block-paragraph">&#8220;Review text goes here.&#8221;</p>



<p class="wi-cs-review__author wp-block-paragraph">— Client Name</p>


</div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
