“Design it once. Build it right.”
Indicatively, 35% of waterproofing defects originate at the design stage, before anyone looks to apply waterproofing membrane. Our design team of architects, engineers, and construction professionals review your waterproofing design to ensure compliance with the National Construction Code, Australian Standards (AS3740, AS4654.2), and material supplier specifications before works begin.
We work with the likes of architects, Tier 1, 2 and 3 builders, developers, and project managers to provide:
- Design compliance reviews — Drawings, sections, details, and specifications reviewed against NCC and relevant Australian Standards
- Performance solutions — Where deemed-to-satisfy provisions don’t clearly address the design, we develop performance-based solutions
- Inground and Basement waterproofing design — Bespoke approach based on site conditions, intended use, Council requirements, and Water Authority prescriptions
- Waterproofing Section Details — Inform your project with compliant details prepared by our team appropriate for your project needs
- Remedial design — For existing buildings with defects, we design the rectification scope, specify materials, and manage the remedial process
- Workshops and mark-ups — Collaborative sessions with design teams to resolve waterproofing details before they become site problems
- Declared designs (NSW) — Supporting regulatory compliance with documented waterproofing design declarations
1000
Designs delivered
35%
of defects are design-related
$0
The cost of fixing a defect that never happens
Our design team includes qualified architects, civil engineers, and construction managers. We review everything from internal wet areas to rooftop podiums to basement tanking systems.